<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Red Rock Consulting</title>
	<atom:link href="http://www.redrockgeo.com/feed" rel="self" type="application/rss+xml" />
	<link>http://www.redrockgeo.com</link>
	<description></description>
	<lastBuildDate>Fri, 02 Jul 2010 18:40:45 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.8.4</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>BRIDGE Certified</title>
		<link>http://www.redrockgeo.com/archives/bridge-certified</link>
		<comments>http://www.redrockgeo.com/archives/bridge-certified#comments</comments>
		<pubDate>Fri, 02 Jul 2010 18:40:45 +0000</pubDate>
		<dc:creator>kkb</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.redrockgeo.com/?p=588</guid>
		<description><![CDATA[In June, 2010 Red Rock Consulting was certified as a Building Resources In Developing &#38; Growing Enterprises (BRIDGE) business by the City of Tulsa. 
The City of Tulsa&#8217;s BRIDGE program is much like ODOT&#8217;s DBE program, where larger firms are encouraged to use firms owned by minorities and women.  ODOT and the City of Tulsa frequently specify a [...]]]></description>
			<content:encoded><![CDATA[<p>In June, 2010 Red Rock Consulting was certified as a <a href="http://www.redrockgeo.com/wp-content/uploads/BRIDGE-Certificate.pdf">Building Resources In Developing &amp; Growing Enterprises (BRIDGE)</a> business by the City of Tulsa. </p>
<p>The City of Tulsa&#8217;s BRIDGE program is much like ODOT&#8217;s DBE program, where larger firms are encouraged to use firms owned by minorities and women.  ODOT and the City of Tulsa frequently specify a percentage of a project must utilize DBE/BRIDGE certified companies when possible.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.redrockgeo.com/archives/bridge-certified/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Livin&#8217; on Tulsa Time&#8230;</title>
		<link>http://www.redrockgeo.com/archives/livin-on-tulsa-time</link>
		<comments>http://www.redrockgeo.com/archives/livin-on-tulsa-time#comments</comments>
		<pubDate>Tue, 29 Jun 2010 20:32:27 +0000</pubDate>
		<dc:creator>kkb</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.redrockgeo.com/?p=568</guid>
		<description><![CDATA[Red Rock Consulting and DSO recently completed two projects in Tulsa, Oklahoma.  One was a commercial development and the other was a municipal pavement project.
Our team travels all over Oklahoma and north Texas to provide geotechnical engineering services.  We have worked from Woodward, Oklahoma to Marshall, Texas and many places in between.
 
]]></description>
			<content:encoded><![CDATA[<div id="attachment_565" class="wp-caption alignright" style="width: 235px"><img class="size-medium wp-image-565" title="Tulsa Site" src="http://www.redrockgeo.com/wp-content/uploads/Tulsa-003-225x300.jpg" alt="A recent project site in Tulsa, Oklahoma." width="225" height="300" /><p class="wp-caption-text">A recent project site in Tulsa, Oklahoma.</p></div>
<p>Red Rock Consulting and DSO recently completed two projects in Tulsa, Oklahoma.  One was a commercial development and the other was a municipal pavement project.</p>
<p>Our team travels all over Oklahoma and north Texas to provide geotechnical engineering services.  We have worked from Woodward, Oklahoma to Marshall, Texas and many places in between.</p>
<p> </p>
<div id="attachment_566" class="wp-caption aligncenter" style="width: 160px"><img class="size-thumbnail wp-image-566 " title="Todd and Kristi" src="http://www.redrockgeo.com/wp-content/uploads/Tulsa-004-150x150.jpg" alt="Kristi Bumpas (RRC) and Todd Simpson (DSO) at a project site in Tulsa, June 2010" width="150" height="150" /><p class="wp-caption-text">Kristi Bumpas (RRC) and Todd Simpson (DSO) at a project site in Tulsa, June 2010</p></div>
]]></content:encoded>
			<wfw:commentRss>http://www.redrockgeo.com/archives/livin-on-tulsa-time/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Thank You, Veterans</title>
		<link>http://www.redrockgeo.com/archives/thank-you-veterans</link>
		<comments>http://www.redrockgeo.com/archives/thank-you-veterans#comments</comments>
		<pubDate>Mon, 31 May 2010 16:03:25 +0000</pubDate>
		<dc:creator>kkb</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.redrockgeo.com/?p=542</guid>
		<description><![CDATA[


Memorial Day

Red Rock Consulting would like to thank all veterans for their selfless contributions to our country and our freedom.  Happy Memorial Day!
]]></description>
			<content:encoded><![CDATA[<div class="mceTemp">
<dl id="attachment_559" class="wp-caption alignright" style="width: 254px;">
<dt class="wp-caption-dt"><img class="size-medium wp-image-559" title="Bailey 5.31.10" src="http://www.redrockgeo.com/wp-content/uploads/Bailey-MemDay1-244x300.jpg" alt="Memorial Day" width="244" height="300" /></dt>
<dd class="wp-caption-dd">Memorial Day</dd>
</dl>
<p>Red Rock Consulting would like to thank all veterans for their selfless contributions to our country and our freedom.  Happy Memorial Day!</p></div>
]]></content:encoded>
			<wfw:commentRss>http://www.redrockgeo.com/archives/thank-you-veterans/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Updated Resumes</title>
		<link>http://www.redrockgeo.com/archives/updated-resumes</link>
		<comments>http://www.redrockgeo.com/archives/updated-resumes#comments</comments>
		<pubDate>Mon, 24 May 2010 20:26:21 +0000</pubDate>
		<dc:creator>kkb</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.redrockgeo.com/?p=524</guid>
		<description><![CDATA[Hey all!  Please check out the &#8220;About&#8221; section of this website.  I just updated my resumes and put them up.  Let me know if you need a resume for another project type.  Happy Monday!
]]></description>
			<content:encoded><![CDATA[<p>Hey all!  Please check out the &#8220;About&#8221; section of this website.  I just updated my resumes and put them up.  Let me know if you need a resume for another project type.  Happy Monday!</p>
]]></content:encoded>
			<wfw:commentRss>http://www.redrockgeo.com/archives/updated-resumes/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Pedological Project</title>
		<link>http://www.redrockgeo.com/archives/pedological-project</link>
		<comments>http://www.redrockgeo.com/archives/pedological-project#comments</comments>
		<pubDate>Tue, 11 May 2010 20:42:15 +0000</pubDate>
		<dc:creator>kkb</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.redrockgeo.com/?p=486</guid>
		<description><![CDATA[ 
I recently spent a day with Dr. Jim Nevels.  Jim taught me how to correctly identify soil series in the field and the &#8220;backsloping&#8221; sampling technique.  Both of these are important when conducting a pedological soil survey.
 
For a pedological survey, the proposed alignment of a roadway is plotted on county soil survey maps to determine which [...]]]></description>
			<content:encoded><![CDATA[<div id="attachment_485" class="wp-caption alignleft" style="width: 235px"><img class="size-medium wp-image-485 " title="Pedological" src="http://www.redrockgeo.com/wp-content/uploads/Drilling-003-225x300.jpg" alt="Dr. Jim Nevels takes samples for a pedological project." width="225" height="300" /><p class="wp-caption-text">Dr. Jim Nevels takes samples for a pedological project.</p></div>
<div class="mceTemp"> </div>
<div class="mceTemp">I recently spent a day with Dr. Jim Nevels.  Jim taught me how to correctly identify soil series in the field and the &#8220;backsloping&#8221; sampling technique.  Both of these are important when conducting a pedological soil survey.</div>
<div class="mceTemp"> </div>
<div class="mceTemp">For a pedological survey, the proposed alignment of a roadway is plotted on county soil survey maps to determine which soil series are intersected.  Then the soil series are located and sampled in the field.  The soil series can be found along the alignment or a short distance away.  Sometimes the soil series is exposed, as with a creek bed (see picture, left) and can be sampled using the &#8220;backsloping&#8221; technique.  The samples are tested for soil classification, pH, resistivity, sulfates (as appropriate) and resilient modulus. </div>
<div class="mceTemp"> </div>
<div class="mceTemp">ODOT geotechnical specifications state that pedological surveys are required for new highway alignments, new parallel construction of grade (embankment and/or cut) adjacent to existing highway alignments and the raising of grade on and above existing highway alignments.</div>
<div class="mceTemp"> </div>
<div class="mceTemp">This pedological survey was for Interstate 40 in Del City, Oklahoma.</div>
]]></content:encoded>
			<wfw:commentRss>http://www.redrockgeo.com/archives/pedological-project/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Valley Hope</title>
		<link>http://www.redrockgeo.com/archives/valley-hope</link>
		<comments>http://www.redrockgeo.com/archives/valley-hope#comments</comments>
		<pubDate>Tue, 11 May 2010 20:42:01 +0000</pubDate>
		<dc:creator>kkb</dc:creator>
				<category><![CDATA[Pictures]]></category>
		<category><![CDATA[Projects]]></category>

		<guid isPermaLink="false">http://www.redrockgeo.com/?p=490</guid>
		<description><![CDATA[ 
Red Rock Consulting and DSO drilled a project at Valley Hope in Cushing, Oklahoma in April, 2010.  While Brad was not admitted, he did think the fried chicken dinner sounded tasty.
 
The project included a three story addition to a building that was originally the home of a local oil baron built in the 1920&#8217;s.


]]></description>
			<content:encoded><![CDATA[<div id="attachment_489" class="wp-caption alignright" style="width: 289px"><img class="size-medium wp-image-489  " title="Committing Brad" src="http://www.redrockgeo.com/wp-content/uploads/Drilling-002-279x300.jpg" alt="Brad Bettes (DSO) at Valley Hope in Cushing, OK" width="279" height="300" /><p class="wp-caption-text">Brad Bettes (DSO) takes a break from drilling at Valley Hope in Cushing, OK</p></div>
<div class="mceTemp"> </div>
<div class="mceTemp">Red Rock Consulting and DSO drilled a project at Valley Hope in Cushing, Oklahoma in April, 2010.  While Brad was not admitted, he did think the fried chicken dinner sounded tasty.</div>
<div class="mceTemp"> </div>
<div class="mceTemp">The project included a three story addition to a building that was originally the home of a local oil baron built in the 1920&#8217;s.</div>
<div class="mceTemp">
<div id="attachment_492" class="wp-caption aligncenter" style="width: 215px"><img class="size-full wp-image-492" title="Valley Hope" src="http://www.redrockgeo.com/wp-content/uploads/Valley-Hope.jpg" alt="Valley Hope Treatment Facility" width="205" height="147" /><p class="wp-caption-text">Valley Hope Treatment Facility</p></div>
</div>
]]></content:encoded>
			<wfw:commentRss>http://www.redrockgeo.com/archives/valley-hope/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Work It</title>
		<link>http://www.redrockgeo.com/archives/work-it</link>
		<comments>http://www.redrockgeo.com/archives/work-it#comments</comments>
		<pubDate>Wed, 31 Mar 2010 17:42:48 +0000</pubDate>
		<dc:creator>kkb</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.redrockgeo.com/?p=478</guid>
		<description><![CDATA[
What recession?!  Red Rock Consulting has been very fortunate to be busy the past 9 months.  And now that we are through the winter and funding has thawed a little, the RFPs and new projects are funneling in.  It is great that our local economy has stayed &#8220;above average&#8221; and seems to be picking up the pace.  Keep &#8216;em coming!    

]]></description>
			<content:encoded><![CDATA[<div class="mceTemp mceIEcenter">
<div class="mceTemp mceIEcenter" style="text-align: justify;">What recession?!  Red Rock Consulting has been very fortunate to be busy the past 9 months.  And now that we are through the winter and funding has thawed a little, the RFPs and new projects are funneling in.  It is great that our local economy has stayed &#8220;above average&#8221; and seems to be picking up the pace.  Keep &#8216;em coming!    </div>
<div id="attachment_477" class="wp-caption aligncenter" style="width: 310px"><img class="size-medium wp-image-477" title="KKB at work" src="http://www.redrockgeo.com/wp-content/uploads/KKB-3.31.10-004.cropped-300x243.jpg" alt="Hard at work in Edmond" width="300" height="243" /><p class="wp-caption-text">Hard at work in Edmond</p></div>
</div>
]]></content:encoded>
			<wfw:commentRss>http://www.redrockgeo.com/archives/work-it/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Special Requirements at Vance AFB</title>
		<link>http://www.redrockgeo.com/archives/special-requirements-at-vance-afb</link>
		<comments>http://www.redrockgeo.com/archives/special-requirements-at-vance-afb#comments</comments>
		<pubDate>Wed, 24 Feb 2010 21:25:07 +0000</pubDate>
		<dc:creator>kkb</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.redrockgeo.com/?p=457</guid>
		<description><![CDATA[



  




Red Rock Consulting and DSO recently completed a project at Vance Air Force Base in Enid, Oklahoma, that had special requirements.  US Army Corps of Engineers required the geotechnical team to core bedrock materials.  The Corps also requested that environmental precautions be taken because the project site was located within the base&#8217;s trichloroethylene (TCE) plume.
Rock coring is [...]]]></description>
			<content:encoded><![CDATA[<div class="mceTemp mceIEcenter">
<div class="mceTemp mceIEcenter">
<div class="mceTemp mceIEcenter">
<div class="mceTemp mceIEcenter">
<div class="mceTemp mceIEcenter">  </div>
</div>
</div>
</div>
</div>
<p>Red Rock Consulting and DSO recently completed a project at Vance Air Force Base in Enid, Oklahoma, that had special requirements.  US Army Corps of Engineers required the geotechnical team to core bedrock materials.  The Corps also requested that environmental precautions be taken because the project site was located within the base&#8217;s trichloroethylene (TCE) plume.</p>
<p>Rock coring is not a standard procedure in many parts of Oklahoma.  It requires that the rock be drilled using wet rotary methods. </p>
<div id="attachment_385" class="wp-caption aligncenter" style="width: 160px"><img class="size-thumbnail wp-image-385" title="Wet Rotary Drilling" src="http://www.redrockgeo.com/wp-content/uploads/img_0013-150x150.jpg" alt="Wet Rotary Drilling" width="150" height="150" /><p class="wp-caption-text">Wet Rotary Drilling</p></div>
<div class="mceTemp" style="TEXT-ALIGN: left">A five foot long three inch diameter core barrel was used to recover bedrock materials which consisted of siltstone with shale layers.  </div>
<div id="attachment_387" class="wp-caption alignleft" style="width: 160px"><img class="size-thumbnail wp-image-387 " title="Core Barrel" src="http://www.redrockgeo.com/wp-content/uploads/core-barrel-150x150.jpg" alt="Core Barrel" width="150" height="150" /><p class="wp-caption-text">Core Barrel</p></div>
<p> </p>
<div id="attachment_389" class="wp-caption alignleft" style="width: 160px"><img class="size-thumbnail wp-image-389 " title="Core Sample" src="http://www.redrockgeo.com/wp-content/uploads/IMG_0967-150x150.jpg" alt="Core Sample" width="150" height="150" /><p class="wp-caption-text">Core Sample</p></div>
<div class="mceTemp"> </div>
<div class="mceTemp"> </div>
<p> </p>
<div class="mceTemp mceIEcenter"> </div>
<p> </p>
<p> </p>
<p> </p>
<p> </p>
<p> </p>
<p>In addition to coring bedrock, the auger and wet rotary soil cuttings had to be contained in a drum.  Soil samples were then sent to an environmental laboratory to be tested for contamination.  The lab results will determine how the drum of soil will be disposed of.</p>
<div id="attachment_386" class="wp-caption aligncenter" style="width: 160px"><img class="size-thumbnail wp-image-386" title="Placing Suspected Contaminated Soil into Drum" src="http://www.redrockgeo.com/wp-content/uploads/img_0020-150x150.jpg" alt="Placing Suspected Contaminated Soil into Drum" width="150" height="150" /><p class="wp-caption-text">Placing Suspected Contaminated Soil into Drum</p></div>
]]></content:encoded>
			<wfw:commentRss>http://www.redrockgeo.com/archives/special-requirements-at-vance-afb/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Sulfates in Soil, Part IV</title>
		<link>http://www.redrockgeo.com/archives/sulfates-in-soil-part-iv</link>
		<comments>http://www.redrockgeo.com/archives/sulfates-in-soil-part-iv#comments</comments>
		<pubDate>Wed, 24 Feb 2010 21:02:50 +0000</pubDate>
		<dc:creator>kkb</dc:creator>
				<category><![CDATA[Sulfates]]></category>
		<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.redrockgeo.com/?p=435</guid>
		<description><![CDATA[HOW TO PREVENT FAILURE
Known Sulfate Counties
The Oklahoma Department of Transportation (ODOT) and the Texas Department of Transportation (TexDOT) keep a record of known sulfate counties in their respective states. 
These are counties where sulfates have been verified through laboratory testing and/or sulfate heave has been a problem in the past.  These maps of known sulfate occurrences [...]]]></description>
			<content:encoded><![CDATA[<h4>HOW TO PREVENT FAILURE</h4>
<h5>Known Sulfate Counties</h5>
<p>The Oklahoma Department of Transportation (ODOT) and the Texas Department of Transportation (TexDOT) keep a record of known sulfate counties in their respective states. </p>
<p>These are counties where sulfates have been verified through laboratory testing and/or sulfate heave has been a problem in the past.  These maps of known sulfate occurrences are helpful for the government agencies and consultants who may have projects in the areas.  If sulfates have been found in or near their project area, sulfate testing and/or preventative measures in design can be taken.</p>
<p>The sulfates counties for Oklahoma and Texas are shown below, courtesy of ODOT and TexDOT (Harris, Sebesta, Scullion, 2004).</p>
<p> </p>
<p align="center"><strong> <strong>Sulfate Counties in Oklahoma</strong></strong></p>
<p style="text-align: center;" align="center"><strong><img class="aligncenter size-full wp-image-447" title="Oklahoma Sulfate Counties" src="http://www.redrockgeo.com/wp-content/uploads/OK-Cos.bmp" alt="Oklahoma Sulfate Counties" width="341" height="255" /></strong></p>
<p style="text-align: center;" align="center">  </p>
<p align="center"><strong>            </strong></p>
<p align="center"><strong>Sulfate Counties in Texas</strong></p>
<p style="text-align: center;" align="center"><strong><img class="aligncenter size-full wp-image-440" title="Texas Sulfate Counties" src="http://www.redrockgeo.com/wp-content/uploads/TX-Cos.bmp" alt="Texas Sulfate Counties" width="267" height="248" /></strong></p>
]]></content:encoded>
			<wfw:commentRss>http://www.redrockgeo.com/archives/sulfates-in-soil-part-iv/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Advantages of On-Site Engineering</title>
		<link>http://www.redrockgeo.com/archives/advantages-of-on-site-engineering</link>
		<comments>http://www.redrockgeo.com/archives/advantages-of-on-site-engineering#comments</comments>
		<pubDate>Tue, 23 Feb 2010 20:53:25 +0000</pubDate>
		<dc:creator>kkb</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.redrockgeo.com/?p=364</guid>
		<description><![CDATA[Commercial and residential projects in Oklahoma do not require on-site geotechnical engineering.  Most geotechnical firms do not provide on-site engineering in their basic services.  Red Rock Consulting always recommends and performs on-site engineering, unless instructed otherwise by the client.  On-site geotechnical engineering ensures accurate boring locations, boring logs, on-site changes in scope and the identification of problematic soils common to Oklahoma and north Texas.  The best geotechnical engineering reports are those written by engineers who know the project objectives and who have seen the project site first hand.  The report is written specifically for the site that was observed and the soil conditions encountered.   ]]></description>
			<content:encoded><![CDATA[<div class="mceTemp">
<div class="mceTemp">
<div class="mceTemp">
<div class="mceTemp">
<div class="mceTemp">
<div class="mceTemp">
<div class="mceTemp"> </div>
<p>Commercial and residential projects in Oklahoma do not require on-site geotechnical engineering.  Most geotechnical firms do not provide on-site engineering in their normal scopes of work and fee proposals.  Because of this, many geotechnical engineers never see the site of the project they are providing recommendations for.  Red Rock Consulting always recommends on-site engineering and provides it on each project unless a special exception has been agreed upon with the client for a specific project.     </p></div>
</div>
</div>
</div>
</div>
</div>
<p>Geotechnical engineering recommendations are site specific for every project.  Physically observing the site, the surroundings and the subsurface materials as they come out of the ground is crucial to providing the best recommendations for the project.</p>
<h5>ADVANTAGES OF ON-SITE ENGINEERING</h5>
<div id="attachment_381" class="wp-caption alignright" style="width: 160px"><img class="size-thumbnail wp-image-381" title="KB Marking Borings" src="http://www.redrockgeo.com/wp-content/uploads/IMG_2496-150x150.jpg" alt="Marking Boring Locations" width="150" height="150" /><p class="wp-caption-text">Marking Boring Locations</p></div>
<ul>
<li> LOCATION AND RELOCATION OF BORINGS</li>
</ul>
<p>Geotechnical borings should be located on-site by the engineer.  The geotechnical engineer is the only person who has been in contact with the client and with direct knowledge of the project objectives, constraints and concerns.  In addition, the geotechnical engineer is the only person who has communicated with the utility locators. </p>
<p>Many sites have obstructions or other reasons why the borings cannot be located at the preferred locations.  With a geotechnical engineer on site the decision is made with the proposed project in mind by an engineer familiar with the project and needs of the client.</p>
<div id="attachment_388" class="wp-caption alignright" style="width: 160px"><img class="size-thumbnail wp-image-388" title="Field Logs" src="http://www.redrockgeo.com/wp-content/uploads/field-logs-150x150.jpg" alt="Field Logs" width="150" height="150" /><p class="wp-caption-text">Field Logs</p></div>
<ul>
<li> MORE ACCURATE BORING LOGS</li>
</ul>
<p>A geotechnical engineer on-site should always log the borings as the drilling is taking place.  In this case, the drill crew is allowed to focus on the equipment and the &#8220;feel&#8221; of the subsurface conditions as the borings are advanced.  The geotechnical engineer should communicate with the drill crew regarding drilling, field testing and subsurface conditions and observe and log the soil samples as they are produced.</p>
<p>When a geotechnical engineer logs the borings, site specific questions can be addressed more quickly.  Changes in boring depth and sampling of special soil conditions, which are both discussed below, are two examples of on-site issues that may arise on a project.</p>
<ul>
<li>   CHANGES IN BORING DEPTH</li>
</ul>
<p>Occasionally borings need to be advanced to a different depth than planned due to encountering unanticipated subsurface materials, such as deep or shallow bedrock or very soft materials, for example.  With a geotechnical engineer on site, the decision to extend or terminate the boring can be made without having to return to the site, which would result in additional mobilization and soil drilling charges.</p>
<ul>
<li>
<div class="mceTemp"> SPECIAL SOIL CONDITIONS</div>
<p><div id="attachment_382" class="wp-caption alignright" style="width: 160px"><img class="size-thumbnail wp-image-382" title="KB &amp; TS with drill rig" src="http://www.redrockgeo.com/wp-content/uploads/img_0009-150x150.jpg" alt="Communicating with Drillers" width="150" height="150" /><p class="wp-caption-text">Communicating with Drillers</p></div></li>
</ul>
<p class="mceTemp">Oklahoma has a number of soil conditions which can be identified on site by a trained geotechnical engineer.  Two examples of such soils are expansive soils and sulfate rich soils, both of which can be detrimental to construction projects if left unidentified.  A geotechnical engineer, who is on the project site and observing the soil, can identify these problematic soils immediately and have them tested in order to provide proper recommendations to combat such soils. </p>
<ul>
<li>GEOTECHNICAL SOLUTIONS</li>
</ul>
<p>The best geotechnical engineering reports are those written by engineers who know the project objectives and who have seen the project site first hand.  The report is written specifically for the site that was observed and the soil conditions encountered.   In addition, if any questions arise during design and/or construction, the geotechnical engineer can provide informed solutions as a result of the on<strong>-</strong>site experience during the geotechnical investigation.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.redrockgeo.com/archives/advantages-of-on-site-engineering/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
